How We Took a Key Injection Platform to PCI P2PE Listing in 12 Months Instead of 16 for a Global Payment Terminal Manufacturer
A global payment terminal manufacturer needed the US instance of its remote key injection platform listed by PCI SSC as a component of PCI P2PE solutions, because US acquirers require it. Together with the client’s teams, we designed a high availability architecture and a model in which P2PE requirements are part of daily work rather than an audit project. The listing came after 12 months, 4 months ahead of plan.
Who the client is and the challenge they brought to us
Industry
The client is a global payment terminal manufacturer whose devices are used by merchants on several continents. Its remote key injection platform delivers cryptographic keys to terminals that encrypt card data point to point (P2PE). The US instance serves all of the manufacturer’s customers in that market.
The Challenge
US acquirers that offer P2PE solutions to merchants require every component of those solutions to be listed by PCI SSC. The platform therefore had to meet the PCI Point-to-Point Encryption (P2PE) Standard while moving to a high availability architecture. The client did not want a project after which compliance would have to be rebuilt in every subsequent cycle.
What Was at Stake
Without a PCI P2PE listing, the manufacturer’s offering to acquirers that require P2PE solutions would have been limited immediately. Merchants using P2PE benefit from a reduced PCI DSS scope, so for acquirers it is a sales argument the manufacturer could not give up. Teams in the US and in Asia had to agree decisions across time zones.
From architecture review to PCI SSC listing in 12 months
-
The Platform’s Role in a P2PE Solution
We started by explaining what P2PE is for and where the client’s platform fits. A merchant accepting payments through a validated P2PE solution reduces its PCI DSS scope, but only if every component, including key distribution, meets the standard. This showed the teams that compliance is part of the product acquirers sell on.
-
Target Architecture Across 80+ Hours of Workshops
Over more than 80 hours of workshops and consultations, we designed the platform’s target architecture with the client’s teams. Every decision was assessed at once against the standard’s requirements, cryptographic security and service availability. The plan was agreed by teams in the US and in Asia.
-
High Availability From the Ground Up
A platform that delivers keys to terminals nationwide cannot have a single point of failure. We designed a high availability architecture consistent with P2PE requirements, so that redundancy would not open new paths to the keys. In parallel, the client was replacing its HSM platform, which we describe in a separate case study.
-
Compliance by Default
Instead of a one-off push before the assessment, we built a model in which P2PE requirements are embedded in daily processes: change management, monitoring and component operations. This step is often skipped, yet it decides whether compliance holds up in later cycles.
-
Readiness Review and Evidence Package
We ran a simulated assessment from the assessor’s perspective, closed the remaining gaps and prepared a coherent evidence package. Every element of the architecture and processes was linked to a specific requirement of the standard.
-
Listing on the PCI SSC Website
The US instance of the platform was listed by PCI SSC as a P2PE solution component, 4 months ahead of the original plan. Future assessment cycles do not require a project to be restarted.
Concrete figures showing the impact of the engagement
- 12 months to listing (instead of 16 planned)
- 80+ hours of architecture workshops
- 1 PCI SSC listing as a P2PE component
- HA high availability architecture built from the ground up
- 2 team locations (US and Asia)
For the board, this means a protected offering for acquirers that sell P2PE solutions, and 4 months gained against plan. For operations, it means an architecture with no single point of failure. For compliance teams, evidence is produced in daily work, so future cycles are not a separate project.